Mount Whaleback iron ore mine in the Pilbara, Western Australia

Keynote · HILT CRC Conference

From process innovation to industrial deployment

A keynote on operability, systems thinking and the commercial discipline required to move mining decarbonisation beyond pilot scale.

Event
HILT CRC Conference
Format
Keynote
Focus
Mining decarbonisation

The central idea

Design decarbonisation for industrial reality

Technology scales when reliability, maintenance, energy, materials and commercial risk are treated as one connected system from the beginning.

HILT CRC conference stage

Three ideas

The argument in practice

Start with operability

A solution that frontline teams cannot run and maintain will not survive at industrial scale.

Think beyond one technology

Feed preparation, thermal management, downstream handling and energy supply shape performance together.

Engineer commercialisation

Stage gates, evidence and clear risk ownership turn research programs into investable pathways.

From stage to practice

Grounded in delivery

The keynote drew on minerals-processing delivery to explain what makes projects bankable: repeatable data, transparent cost models and pilots that resemble production conditions.

  1. Design for maintenance and reliability early.
  2. Align funding with delivery milestones.
  3. Measure energy, throughput and quality together.
  4. Clarify risk across every partner.

Why it matters

Mining decarbonisation is a leadership and systems challenge as much as a technology challenge.